Kalahari GeoEnergy Ltd Logo  
 
 
   

 

     
   

13 June 2017
USTDA Creates Opportunities for U.S. Energy Industry in Zambia

Lusaka, Zambia – Today, the U.S. Trade and Development Agency signed a grant with Kalahari GeoEnergy Limited, a Zambian geothermal development company, for a feasibility study supporting the development of a 10-20 MW geothermal power plant.

Link to article on the USTDA website.

 
 

___________________________________________________________________________________________________________________________________

 
     
   

26 November 2016
Kalahari GeoEnergy CEO presents at the 6th African Rift Geothermal Conference held in
Addis Ababa, Ethiopia, from the 2nd to the 4th of November 2016.

Dowload the Country Update Report for Zambia in pdf file format here.

 
 

 

 
 

___________________________________________________________________________________________________________________________________

16 September 2016
Kensington, Chelsea & Westminster Sept 2016 Friday Scitech Article

___________________________________________________________________________________________________________________________________

 

 

 
 

ESI Africa Journal Issue 3 2016
07 September 2016

Kalahari GeoEnergy Article from ESI Africa - Africa's Power Journal

___________________________________________________________________________________________________________________________________

 

   

15 August 2016
Kalahari Geoenergy: Zambia's Energy Heads Towards Thermal

Article featured by The Sustainable Business Review (UK)

Link to PDF
Link to live version [external link]
Link to The Sustainable Business Review website [external link]

 
 

 

 
 

___________________________________________________________________________________________________________________________________

21 April 2016
KGE announces positive update on their ongoing Geothermal Resource Assessment of their Kafue Trough Target

Dowload the Press Release in pdf file format here.

___________________________________________________________________________________________________________________________________

16 August 2015
Commenced drilling further temperature gradient holes at Bwengwa River. This is part of an anticipated six hole programme to define the geothermal resource.

___________________________________________________________________________________________________________________________________

17 November 2014
Geothermal Exploration Update

___________________________________________________________________________________________________________________________________

29 October 2014
Exploration for Sedimentary Basin Hosted Low-Enthalpy Geothermal Systems in Zambia
Published in the Proceedings of the 5th African Rift Geothermal Conference, Arusha, Tanzania, 29-31 October 2014

___________________________________________________________________________________________________________________________________

Thinkgeoenergy.com
29 October 2013

Interview with Peter Vivian-Neal, CEO of Kalahari GeoEnergy in Zambia.

___________________________________________________________________________________________________________________________________

11 September 2013
Kalahari GeoEnergy Spuds first Exploration Well at Lochinvar Geothermal Target.

___________________________________________________________________________________________________________________________________

Thinkgeoenergy.com
24 June 2013

Kalahari GeoEnergy to start early exploration work in Zambia.

 

   

 

   

Drilling Well 06 in 2016

Drilling Well 04 in 2015

Drill steel

Grout plant on well 06

Blow out preventer –
Well 02 in 2013

   

Measuring core
recovery

The Core shed

Dawn at Bwengwa River –
down hole survey

Slickline winch

Hand winding the slickline

   

Well head during down
hole survey

Birds eye view of
slickline stripper

Hand measurement of
discharge from artisanal
flowing well

Bwengwa sampling

CEO at Bwengwa

   

Charcoal (together with wood)
currently provides 70% of
primary energy in Zambia

Cattle are driven into
Lochinvar Park every day
creating environmental
derogation and pressure on
the wildlife habitat

Drill Well 06 in 2016

Aerial view of well 05

Storm clouds over
Sebanzi Hill

   

Palm trees on Kafue
Graben

Aerial photography of
thermal springs

Aerial photography of
thermal springs

Aerial photography of
thermal springs

Aerial photography of
thermal springs

   

CEO briefing visitors

Lubungu Thermal Spring
eye

Breccia outcrop

Topological feature on
Kafue Graben

Breccia outcrop

   

Crossing the Kafue
River

View of Kapisya Geothermal
pilot plant built in 1986

View of Kapisya Geothermal
pilot plant built in 1986

View of Kapisya Geothermal
pilot plant built in 1986

Cessna Caravan landing
Lochinvar airstrip; rehabilitated
by Kalahari for the drill
programme. 40 minutes by air
or 6 hours by road from Lusaka

   

Well LOCH02 drill site
October 2013

Well LOCH02 drill site
October 2013

Bwengwa River area
October 2013

Sunset over Well LOCH02
drill site
October 2013

Commencement of 2015
drill programme

   

 

 

Kalahari GeoEnergy Ltd Prospectus
January 2018

505 KB | PDF

Kalahari GeoEnergy Ltd is a member of the International Geothermal
Association. For further information on Geothermal Energy and power
production please see www.geothermal-energy.org



Tel:
Email:
Office:

Group:



(+260) 0211 840 431
info@kalaharigeoenergy.com
40 Jesmondine (Corner Central St & Mwambula Rd), Lusaka, ZAMBIA
Unit D, 11th Floor, Ho Lee Building, 38-44 D’Aguilar St, Central, HONG KONG

To top of page | Home page | Contact us | Terms of use | Disclaimer | Privacy Policy | Site Map | Email the Webmaster